RESOLUTION: 2008-28
SUBJECT: Utility Relocation Agreement with the Regional Transportation District (RTD).
RECOMMENDATION: Approval
SUMMARY AND BACKGROUND OF SUBJECT MATTER:
The City of Lakewood owns and operates water and sanitary sewer facilities within portions of the West Corridor Light Rail Transit (LRT) Project. Several sections of Lakewood's water and sanitary sewer facilities have been identified as being in conflict with proposed LRT construction.
This Utility Relocation Agreement documents the agreement between Lakewood and RTD defining cost responsibilities and outlining who will perform the necessary utility relocation in a timely manner as to not delay LRT construction. This agreement is a standard agreement that RTD has used for all utility owners with facilities in the West Corridor LRT project area.
A summary of the key agreement components follows:
1. Covers relocation of City owned water and sewer facilities necessitated
by the West Corridor project.
2. RTD is reimbursing the water utility for all relocation work required because
the facilities are in City-owned right-of-way (ROW). This work is not an improvement
previously identified by the water utility. Cost at this time is unknown.
3. The sewer utility has planned to replace a sewer line in 13th Ave from Balsam
to Lamar because the line is in poor condition. This section is in City-owned
ROW and the City has been credited $1,854,000 against Lakewood's local share
match for the West Corridor project.
4. RTD is reimbursing the sewer utility for all relocation work required between
Lamar and Harlan Street because the facilities are in City-owned ROW or easements.
Reimbursement to the sewer utility will be based on actual construction costs
from competitive bids. Cost at this time is unknown. This work is required solely
for the benefit of the West Corridor project and was not an improvement previously
identified by the sewer utility.
5. Five sewer crossings of RTD-owned ROW and two segments of sewer pipe in RTD-owned
ROW need to be replaced or relocated. RTD's contractor will perform this work.
The cost will be borne by the sewer utility and there will be no credit for
this work toward Lakewood's local share match because the utility facilities
are in RTD-owned ROW. Reimbursement to RTD will be based on actual construction
costs from competitive bids. At this time is the work is estimated to cost $175,000
to $200,000. The Lakewood Sewer Utility Enterprise Fund has adequate funds to
pay for these costs.
FUNDING SOURCE: Lakewood Sewer Utility Enterprise Funds and LRT Project Funds
RESOLUTION ADOPTION DATE: February 11, 2008
ORIGINATED BY: Department of Public Works
STAFF PERSON RESPONSIBLE: Vince Casteel, Design Section Head, 303-987-7941
DOCUMENTS ATTACHED: Resolution
2008-28
Utility Relocation Agreement
and Exhibits
Exhibit A
Exhibit B
Exhibit C
Exhibit D-1
Exhibit D-2
Exhibit F
Exhibit G
Exhibit H
Exhibit I
Exhibit J
SUBMITTED BY:
Richard J. Plastino, Director of Public Works
REVIEWED BY:
Joni Inman, Director, Mayor and City Manager's Office
Michael J. Rock, City Manager
|
|
||
Americans with Disability Act (ADA) Notice |
||