![]() |
![]() |
|
03-
A RESOLUTION
RECOMMENDING SUPPORT FOR THE US6/SH 121 INTERCHANGE RECONSTRUCTION FEASIBILITY STUDY AND THE WADSWORTH CORRIDOR STUDY BEING ADDED TO THE REAUTHORIZATION OF THE TEA-21 LEGISLATION.
WHEREAS, State Highway 121, Wadsworth Boulevard, is on the National Highway
System (NHS), and;
WHEREAS, Wadsworth Boulevard is a major regional arterial in the Denver area Regional Transportation Plan, and;
WHEREAS, Wadsworth Boulevard is an arterial roadway in the Countywide Transportation Plan, and;
WHEREAS, Wadsworth Boulevard is an arterial roadway in the City of Lakewood's Major Street Plan, carrying in excess of 55,00 vehicles per day, and;
WHEREAS, the Wadsworth Boulevard and US 6 interchange is a part of the unfounded 7th Pot requested by the Colorado Department of Transportation for reauthorization, and;
WHEREAS, Wadsworth Boulevard has been submitted by Jefferson County as a project request for the federal transportation reauthorization,
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Lakewood, that:
SECTION 1. The City of Lakewood supports inclusion of the Feasibility Study for the U.S. 6/ S.H 121 (Wadsworth) interchange in the federal transportation reauthorization bill.
SECTION 2. The City of Lakewood supports inclusion of the Corridor Feasibility study of Wadsworth Boulevard in Jefferson County, from C-470 to US 36, in the federal transportation reauthorization bill.
INTRODUCED, READ AND ADOPTED by a vote of ____for and ____against at a regular meeting of City Council on April 14, 2003 at 7 o'clock p.m. at Lakewood City Hall, 480 South Allison Parkway, Lakewood, Colorado
____________________________
Steve Burkholder, Mayor
ATTEST:
____________
Margy Greer
|
|
||
Americans with Disability Act (ADA) Notice |
||